The first one of two turbines which landed in Prince Rupert on Dec. 2, is headed to Site C Dam in Fort St. John on Jan 10. The extraordinary wide load created traffic advisories and road closures along highway 16 during the week of Jan. to 14. (Photo: supplied by Tasha McKenzie)

The first one of two turbines which landed in Prince Rupert on Dec. 2, is headed to Site C Dam in Fort St. John on Jan 10. The extraordinary wide load created traffic advisories and road closures along highway 16 during the week of Jan. to 14. (Photo: supplied by Tasha McKenzie)

VIDEO: Second massive turbine passes through Telkwa en route to Site C Dam

The load is 221-feet-long, 26-feet wide and weighs more than 170 tonnes

The second of two massive hydroelectric turbines headed for the Site C Dam in Fort St. John passed through Telkwa in around 2:45 Jan 29.

The first of three shipments each of two 170-tonne turbine runners measuring 26 ft (8 metres) wide by 17 feet (5 metres) tall was originally spotted by Black Press Media on Dec. 2 being unloaded by crane from a vessel in the inner harbour onto a barge for transportation to shore.

Video by Airika Owen

The extraordinarily wide, 221-ft long load is travelling by night to be as minimally disruptive to traffic as possible. Today, it is resting at Hungry Hill between Telkwa and Houston.

READ MORE: Massive turbines for Site C unloaded in Prince Rupert

“The turbine runners are the heaviest unassembled single project component of equipment related to the generating station,” Dave Conway, community relations manager for the Site C project told Black Press Media.

The specially built cargo was constructed and shipped from Sao Paulo, Brazil as part of a $470 million contract between BC Hydro and Voith Hydro Canada. The hydroelectric turbines are unique, built to suit the needs of the Site C Dam requirements.

The transportation firm Omega Morgan, which specializes in oversized load transportation is overseeing the movement between Prince Rupert and the Site C Dam.

The turbines are set to be installed at Site C in 2022. There will be six vertical axis turbines in total, with two more shipments to be confirmed, however, not expected until the spring of 2021 and the summer of 2022, Conway said.

With files from Thom Barker

READ MORE: Work begins on Site C generators (with video)



editor@interior-news.com

Like us on Facebook and follow us on Twitter

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

The RCMP arrest one of the suspects on Highway 97 courtesy of cell phone footage shot by a bystander. (April Thomas photo)
WATCH: Two suspects arrested after multi-jurisdictional chase

A half dozen police cars were seen heading north on Highway 97

A nurse performs a test on a patient at a drive-in COVID-19 clinic in Montreal, on Wednesday, October 21, 2020. THE CANADIAN PRESS/Paul Chiasson
Interior Health reports 16 new COVID-19 cases

423 cases remain active in the region

(Phil McLachlan/Capital News)
Murder charge laid in February 2020 stabbing death of Smithers man

Michael Egenolf is charged with the second-degree murder of Brodie Cumiskey

A man wearing a mask against coronavirus walks past an NHS advertisement about COVID-19 in London, Tuesday, Feb. 2, 2021. (AP Photo/Alastair Grant)
92 new COVID-19 cases, no new deaths: Interior Health

The region is reporting 92 cases after the weekend

Island Health chief medical officer Dr. Richard Stanwick receives a first dose of Pfizer vaccine, Dec. 22, 2020. (B.C. government)
COVID-19: B.C. seniors aged 90+ can start to sign up for vaccination on March 8

Long-term care residents protected by shots already given

The area on Cordova Bay Road where ancestral human remains were discovered Feb. 22. (Submitted photo)
Human remains discovery a reminder of B.C. Indigenous culture dug up and displaced

‘These are the people who inspired and birthed the generations that we now have here’

Older rental apartments are prime candidates for renovations, and could result in lost affordable housing stock. (Zoë Ducklow photo)
B.C.’s renoviction overhaul a good start, but won’t preserve affordable stock, lawyer says

And still no protection for people who can’t pay rent due to COVID-19

Kamloops This Week
Cause of Kamloops landfill fire may never be known

Fire investigators are dealing with too much destruction in too large an area

(Photo by Marissa Baecker/Shoot the Breeze)
B.C. WHL teams to hit the ice with Kelowna, Kamloops hub cities

Kelowna, Kamloops centres chosen to host B.C. WHL teams for 24-game regular season

The machines are akin to ATMs and allow drug users at risk of overdose to get hydromorphone pills dispensed to them after their palm has been scanned to identify its unique vein pattern. (CANADIAN PRESS)
Feds dole out $3.5M for ‘vending machines’ to dispense safer opioids in B.C.

The machines are located in four cities across Canada, including Vancouver and Victoria

Kelowna’s lakefront visitor centre is one of 130 around the province. Tourism businesses have been hardest hit by COVID-19 restrictions on travel. (Destination B.C.)
Tourism, small business getting COVID-19 help, B.C. minister says

$300M grant program has delivered $50 million so far

The incident happened in downtown Castlegar. Photo: Betsy Kline
Castlegar teen recounts stabbing after stranger breaks into grandmother’s house

The unnamed teen survived a terrifying attack Feb. 21

Most Read